Local preview healthy
JKFounder Review
DEMO — NOT PRODUCTION EVIDENCE
Measurement assurance

Calibration Console

Traceable standards, certificate integrity, due controls, and affected-decision assessment.

Controlled equipment28Tenant-scoped demo set
Due within 30 days4Planned before expiration
OOT equipment1Equipment quarantined
On-time rate96%Rolling demo period
CAL-93 · Pressure Gauge 12

Out of tolerance

Quarantined
As-found deviation+2.8% FS
Last-known-good2026-06-18
TraceabilityTraceability: NIST-PTB-2291
Mandatory next action

Impact investigation required

Identify measurements, inspections, product, maintenance, and safety decisions made since the last-known-good date.